Project: Performing engineering services for material handling system of Zahedan Chehel Koureh copper mine
- Client: Non-Ferrous Industries Process, Engineering, and Construction Company (NIPEC)
- Duration: 14 months (2012)
- Project Summary: The purpose of this project is to produce 15840 metric tons of copper concentrate per year. The design of the copper mine handling material system has been done by Anin Consulting Engineers Company.