Project: Topographic engineering and surveying of different areas of primary mine crusher, concentrators, warehouses of Sarcheshmeh Copper Plant
- Duration: 3 months (2011)
- Size: 7500 sq meters
- Project Summary: Surveying, topography and surveying of various areas of concentrators, mines, smelters and warehouses of Sarcheshmeh Copper Plant in order to increase production and achieve the pre-defined goals of the plant development plans. The mapped area was approximately 4.6 square kilometers and in this regard, a map with a scale of 1: 200 was prepared and delivered to the client.