Project: Improvements of Sarcheshmeh Copper Plant Lime Factory
- Duration: 36 months (2010)
- Size: 7500 sq meters
- Project Summary: Designing and purchasing engineering for the lime factory of Sarcheshmeh Copper Plant, which has been defined in order to supply the required lime for the concentration and smelting factories. This project has increased the storage capacity of lime in Sarcheshmeh copper plant by 1000 tons and the transfer of materials from the entrance to the final consumer is fully mechanized.