Project: Construction of Sarcheshmeh Copper Plant Lime Unit Repair Shed

  • Client: Molybdenum Carmania Company
  • Duration: 5 months (2012)
  • Necessity of implementation: Installation of a shed intended for the repair unit of Sarcheshmeh Copper Plant Lime Plant, which is designed to create the infrastructure for the repair and maintenance of quick lime and lime plants. The infrastructure of the shed is approximately 580 square meters, which is fully installed and commissioned with all facilities and cover.