Employer: Ministry of Roads and City planning – Iran airports company
Execution Duration: 9 months (2023-2024)
Project Summary: Performing the basic studies for the construction plan of ZahedanAirport foreign flights’ terminal in an area of 7,000 m2, preparing the phase 1 and 2 engineering drawings, as well as preparing the estimation documents and the project executive and technical services description.