Zahedan Airport foreign flights’ terminal

  • Employer: Ministry of Roads and City planning – Iran airports company
  • Execution Duration: 9 months (2023-2024)
  • Project Summary: Performing the basic studies for the construction plan of Zahedan Airport foreign flights’ terminal in an area of 7,000 m2, preparing the phase 1 and 2 engineering drawings, as well as preparing the estimation documents and the project executive and technical services description.