Supreme control, engineering and workshop supervision services for construction of the temporary pumphouse

  • Employer: Iran National Copper Industries
  • Execution Duration: 2014-2015
  • Project Summary: Supervision on designing and engineering, procurement and construction (EPC), test and launch the temporary pumphouse for white water in Sarcheshme Copper Complex that was constructed to supply water for the second phase of concentration development unit construction. Due to the urgency for water supply, this project has been designed, executed and operated before the agreed time in only three months and in a manner of 7*24. Launching the project, the water pumping capacity increased from 12,400 m3 to 20,150 m3.