at the concentration unit of Zahedan Chehl-Kure Copper Mine

  • Employer: Non-Ferrous InTechnical and engineering crushing facilities dustries Process, Engineering, and Construction Company (NIPEC)
  • Execution Duration: 6 months (2013)
  • Project Summary: Satisfied with the results of material handling system at Zahedan Chehel-Kure Copper Mine, he outsourced the design of crushing at the concentration unit of Zahedan Chehl-Kure Copper Mine to ANIN CO.