Providing the plan for modifying the wagon tippler area and its repair crane
Employer: Persian Gulf Mining and Metal Industries Special Economic Zone Company
Execution Duration: 7 months (2010)
Project Summary: All feasible executive operation at Persian Gulf special economic zone have been studied and a plan for the south tippler and its repair crane has been proposed. Repair has been required due to problems in the tippler foundations, its rails, and the assembly wear.