Providing design and engineering services for Kerman Airport Foreign Flights’ Terminal
Employer: Ministry of Roads and City Planning – Iran airports company
Execution Duration: 8 months (2023)
Project Summary: Performing the basic studies for the construction plan of Kerman Airport foreign flights’ terminal in an area of 20,000 m2, as well as preparing the phases 1 and 2 engineering drawings, estimation documents and the project executive and technical services description.