Plan management for the construction project of the concentration plant at Zarar valley, Taft and Chah-Firoozeh (execution estimated over more 300 million Euros)
Employer: Non-Ferrous Industries Process, Engineering, and Construction Company (NIPEC)
Execution Duration: 2014-2019
Project Summary: Plan management and workshop supervision for the Zarar valley, Taft and Chah-Firoozeh concentration factory from the layout, conceptual and basic design phases to the contractor selection and implementation, and providing the detailed design and project execution.