Project: Olang Post

  • Usage: Power supply to Midook mine pumps and workshop shed
  • Size: 100 square meters
  • Capacity: one 20kV / 6.6kV transformer with 2000kVA capacity and one 20kV / 0.4kV transformer with 200kVA capacity
  • Necessity of implementation: Modifying the status and conditions of equipment installation – Replacing chargers and UPS – Modifying input feeders and adding measuring equipment
  • Status: The design is complete and the final report is sent.