ANIN ENGINEERING

Article

Installation and commissioning of the ticker circuit in the Mote Gold Complex

Picture4

Design, manufacture, installation and commissioning of a thickener circuit and filter for recycling water from the factory's industrial waste and a wet screen circuit to separate carbon from waste materials in tailings dams No. 1 and 2 of the Mote Gold Complex

Employer: Iranian Minerals Supply and Production Company

Anin Company Role: 27 months (2023 to 2025)

Project Summary:

This company is responsible for designing and providing workshop supervision services in gold carbon separation, water extraction, development of the gold room and related corridor, as well as renovation of the complex’s facilities and equipment. In this regard, the design and supervision of the workshop and the carbon extraction circuit, which includes a wet screen and related material handling systems, as well as the water extraction system, including tailings thickeners and filter presses, are on the agenda of this consultant.

Others

Contact Us

At Anin Communications, we are committed to minimizing distances and fostering stronger connections. To facilitate engagement with professionals and consultants, enable effective collaboration, and gather valuable feedback from employers and clients, we have established multiple communication channels designed to meet your needs.